Town Creek Culvert Storm Drain Improvements
Greenville, NC
Project Description:
This project included all labor, equipment, materials, and supervision to rehabilitate and replace segments of the aging stormwater conveyance system that conveys runoff from an existing highly urbanized 308.6-acre watershed, with an additional 45.6 acres included with a future NCDOT project, while installing a variety of BMPs that will remove TSS, Nitrogen and phosphorus from the watershed. The proposed project will include the construction of approximately 300 linear feet (LF) of one 84-inch reinforced concrete pipe culvert, 270 LF of 10’X6’ reinforced concrete box culvert, approximately 2180 LF 10’X8’ reinforced concrete box culvert, approximately 21,780 square feet (SF) of bio-retention area, two regenerative stormwater conveyance systems, new water mains, new sewer mains, utility relocations, concrete work, street scape/ landscaping, and asphalt paving.