Thickener Pond Rehabilitation

Aurora, NC


Project Description:

This project included all labor, equipment, materials, and supervision to perform dewatering including installation of over 200 wellpoints, mass excavation of stored clay materials over a 2 acre area, re-grading pond bottom to design elevations approximately 20’ below sea level elevation.