Summerhouse on Everett Bay
Holly Ridge, NC
Project Description:
This project included all labor, materials, and supervision to install all erosion control measures, water distribution system, a sewer collection system, force mains, storm drainage, turn lane intersection and 12 bridges over a 384-acre site. All permitting was conducted in house utilizing our staff engineering.