Redesign CALA Swale
MCAS New River, NC
Project Description:
This project consisted of the maintenance repair of two stormwater outlets on the airfield for New River Air Station. More specifically: repair 1300 SY of dry detention basin / sand filter / sediment forebay, disposal / testing of 500 TN of presumed contaminated material (later deemed not contaminated), repair 1700 SY of a rip rap basin, place 1700 SY of double filter fabric, place 800 TN of rip rap, and 1700 SY of sod.