Harlowe Culvert Replacement
Harlowe, NC
Project Description:
This project consists of the removal of an existing culvert (double barrel 60″ CMP) and the replacement with a single arch culvert (31′ x 9′). The culvert replacement is on a two-lane road and must be constructed in a half/half manner. Water was a big obstacle to overcome on this project. 1550 Square Feet of shoring was utilized to keep the creek water out of the construction zone, along with an additional 85 linear feet of shoring to hold the traffic above the deeper construction depth.