Carteret County Wetlands Restoration
Swansboro, NC
Project Description:
This project consisted of repairing a stormwater outfall pond that was destroyed in Hurricane Florence. The existing stormwater system was completely rebuilt, along with the pond berm separating the main pond and forebay that was washed away during the storm. Over 12,000 wetlands plants and 1.5 acres of wetlands seeding and mulching was installed on this project.