Hyde County Bridge

Engelhard, NC


Project Description:

This project consisted of replacing a remote 6 span wooden bridge with 3 span cored slab bridge. This bridge was built with staged construction (half-and-half). More specifically the project consisted of: grading, asphalt paving, guardrail installation, pavement marking, erosion control, 1160 LF of 16″ prestressed concrete piles (end bents), 1400 LF of 20″ prestressed concrete piles (interior bents), rip rap placement, 30′-50′-40′ cored slab span.