Hyde County, North Carolina
This project consisted of replacing a remote 6 span wooden bridge with 3 span cored slab bridge. This bridge was built with staged construction (half-and-half). More specifically the project consisted of: grading, asphalt paving, guardrail installation, pavement marking, erosion control, 1160 LF of 16" prestressed concrete piles (end bents), 1400 LF of 20" prestressed concrete piles (interior bents), rip rap placement, 30'-50'-40' cored slab span.