New Bern, North Carolina
This project consisted of moving utilities (water, sewer, storm, electric) from the path of an addition to an existing building at Bosch, New Bern plant site. More specifically: erosion control for 2 ac site, concrete sidewalk installation, chain link fence, storm structures and storm pipe installation, water line and sewer main installation as well as associated structures, electrical relocations and associated grade work to bring grading back to existing conditions.