Contact Us

Access Road Running Trail

map pin

MCAS Cherry Point, North Carolina

Project Description:

This design / build project included all labor, materials, and equipment to design and construct an 11-foot-wide stone path with 9-foot-wide paved width for 7200 LF running trail. The design included sealed drawings for 2 pedestrian bridges and environmental permits that were required.

123movies 123movies soap2day soap2day 123movies fmovies movies123