Contact Us

MCAS Cherry Point BT11 Sheet Piling

map pin

MCAS Cherry Point, North Carolina

Project Description:

This project consists of the rehabilitation of an existing bulkhead at MCAS Cherry Point island BT-11. More specifically this project consisted of multiple barge mobilizations; installation of erosion control, 165 wall feet of new AZ sheet piles, 16 earth anchors, 165 LF of concrete coping, 21 EA 12" diameter timber piles, whalers, and connections, 100 TN of ABC, 400 SY of sod, and QC personnel.

123movies 123movies soap2day soap2day 123movies fmovies movies123